題名: | A Column Generation Approach to Solve Proportionate Flexible Flow Shop for Common Due Date Scheduling |
作者: | Shiau, Der-Fang Cheng, Shu-Chen Huang, Yueh-Min Hsu, Pi-Chung |
關鍵字: | Proportionate flow shop proportionate flexible flow shop common due date column generation liner programming |
期刊名/會議名稱: | 2004 ICS會議 |
摘要: | Abstract-This paper addresses a proportionate flexible flow shop for common due date scheduling problem. A proportionate flexible flow shop problem is generalization of the proportionate flow shop problem with multiple identical machines at any stage. The problem of minimizing total weighted deviations of job completion time from a common due date on a single machine is typical scheduling model in Just-In- Time production environment. In this paper, we propose a column generation approach which is based on some properties from V-shaped schedule on a single machine. This problem is actually a portioning problem, and a dynamic programming algorithm is proposed to find an early schedule and a tardy schedule with minimum reduced cost. The combination of column generation and linear programming demonstrate the capability of solving large scale problems. Computational result shows the effectiveness and the capability of solving problems with up to 40 jobs. |
日期: | 2006-10-11T07:55:44Z |
分類: | 2004年 ICS 國際計算機會議 |
文件中的檔案:
檔案 | 描述 | 大小 | 格式 | |
---|---|---|---|---|
ce07ics002004000030.pdf | 330.27 kB | Adobe PDF | 檢視/開啟 |
在 DSpace 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。