題名: | Job Shop Scheduling with Earliness and Tardiness Penalties Using Iterative Repair Method |
作者: | Chiang, Te-Wei Hau, Hai-Yen |
期刊名/會議名稱: | 1996 ICS會議 |
摘要: | In this paper, we propose an approach based on iterative repair for job-shop scheduling problems. This approach had been successfully applied to railway scheduling problems. To show the flexibility of this approach, it has been adapted to the job-shop scheduling problems with weighted early/tardy objective in this paper. The weighted early/tardy objective is compatible with the philosophy of just-in-time (JIT) production to minimize inventory costs. Since the objective function is not a regular performance measure (i.e., a function that is non-decreasing in the completion times). It can not be solved by the conventional theorems on job ordering. The repair-based approach is successfully applied to solve the problems. Experimental results show the efficiency and effectiveness of this approach. |
日期: | 2006-10-24T06:52:37Z |
分類: | 1996年 ICS 國際計算機會議 |
文件中的檔案:
檔案 | 描述 | 大小 | 格式 | |
---|---|---|---|---|
ce07ics001996000057.pdf | 643.56 kB | Adobe PDF | 檢視/開啟 |
在 DSpace 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。