題名: Job Shop Scheduling with Earliness and Tardiness Penalties Using Iterative Repair Method
作者: Chiang, Te-Wei
Hau, Hai-Yen
期刊名/會議名稱: 1996 ICS會議
摘要: In this paper, we propose an approach based on iterative repair for job-shop scheduling problems. This approach had been successfully applied to railway scheduling problems. To show the flexibility of this approach, it has been adapted to the job-shop scheduling problems with weighted early/tardy objective in this paper. The weighted early/tardy objective is compatible with the philosophy of just-in-time (JIT) production to minimize inventory costs. Since the objective function is not a regular performance measure (i.e., a function that is non-decreasing in the completion times). It can not be solved by the conventional theorems on job ordering. The repair-based approach is successfully applied to solve the problems. Experimental results show the efficiency and effectiveness of this approach.
日期: 2006-10-24T06:52:37Z
分類:1996年 ICS 國際計算機會議

文件中的檔案:
檔案 描述 大小格式 
ce07ics001996000057.pdf643.56 kBAdobe PDF檢視/開啟


在 DSpace 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。