完整後設資料紀錄
DC 欄位語言
dc.contributor.authorYen, Wei-Ting
dc.contributor.authorCheng, Chun-Hua
dc.contributor.authorHuang, Shih-Hsu
dc.date.accessioned2009-08-23T04:42:33Z
dc.date.accessioned2020-05-25T06:51:34Z-
dc.date.available2009-08-23T04:42:33Z
dc.date.available2020-05-25T06:51:34Z-
dc.date.issued2007-01-26T01:59:14Z
dc.date.submitted2006-12-04
dc.identifier.urihttp://dspace.lib.fcu.edu.tw/handle/2377/3494-
dc.description.abstractOperation scheduling is the most important task in highlevel synthesis. Most conventional operation scheduling algorithms paid attention to the minimization of control steps or the minimization of resources. However, as the design complexity continues to increase, huge peak power may lead to logic errors due to voltage drops or reliability problems due to electromigration. As the popularization of portable and wireless communication, low power design is getting very important. An efficient power management method is to use control logic to shut down unused operations. On the other hand, longer operation delay, which implies smaller peak power, can be selected if no design constraint (timing and resource). In this paper, we present an ILP (integer linear programming) formulation to model the problem of simultaneous application of power management scheduling and operation delay selection for peak power minimization. Benchmark data consistently show that our approach minimizes the peak power within an acceptable run time.
dc.description.sponsorship元智大學,中壢市
dc.format.extent6p.
dc.format.extent3954972 bytes
dc.format.mimetypeapplication/pdf
dc.language.isozh_TW
dc.relation.ispartofseries2006 ICS會議
dc.subject.otherPower-Aware Design and Test
dc.titleSimultaneous Application of Power Management Scheduling and Operation Delay Selection for Peak Power Minimization
分類:2006年 ICS 國際計算機會議

文件中的檔案:
檔案 描述 大小格式 
ce07ics002006000043.pdf3.86 MBAdobe PDF檢視/開啟


在 DSpace 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。