完整後設資料紀錄
DC 欄位語言
dc.contributor.authorYu, Gwo-Jong
dc.contributor.authorChan, Chih-Yung
dc.contributor.authorChen, Tzung-Shi
dc.date.accessioned2009-06-02T07:21:46Z
dc.date.accessioned2020-05-29T06:16:48Z-
dc.date.available2009-06-02T07:21:46Z
dc.date.available2020-05-29T06:16:48Z-
dc.date.issued2006-11-13T01:49:21Z
dc.date.submitted1999-12-20
dc.identifier.urihttp://dspace.fcu.edu.tw/handle/2377/3137-
dc.description.abstractIn a mesh multicomputer, to perform jobs needs to schedule submeshes according to some processor allocation scheme. In order to assign the incoming jobs, a task compaction scheme is needed to generate a larger contiguous free region. The overhead of compaction depends on the efficiency of the task migration scheme. In this paper, two simple task migration schemes are first proposed in 3D mesh multicomputers with supporting dimension-ordered wormhole routing in one port communication models. Then, a hybrid scheme which combine advantages of the two task migration schemes is discussed. Finally, we compare the performance of all of these proposed approachs.
dc.description.sponsorship淡江大學, 台北縣
dc.format.extent8p.
dc.format.extent668373 bytes
dc.format.mimetypeapplication/pdf
dc.language.isozh_TW
dc.relation.ispartofseries1999 NCS會議
dc.subjectDimension-ordered routing
dc.subjectmesh multicomputers
dc.subjectparallel processing task migration
dc.subjectwormhole routing
dc.subject.otherInterconnection Networks
dc.titleTask Migration in 3D Wormhole-Routed Mesh Multicomputers
分類:1999年 NCS 全國計算機會議

文件中的檔案:
檔案 描述 大小格式 
ce07ncs001999000213.pdf657.13 kBAdobe PDF檢視/開啟


在 DSpace 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。